¡Descubre la campaña Embajadas de Ideas!

Solar Photovoltaic TwinHouse Plant Public Participation Plan

20/9/21
Reading of
min
Share this article
Author
No items found.
Subscribe to our newsletter
By subscribing, you accept our Privacy Policy.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Share this article

If you are from Villena (Alicante), you are interested in this survey of Public Participation Plan of the Installation of the TwinHouse Photovoltaic Solar Plant 9.98 MW of installed power.

As established by Law 5/2014, of July 25, on Spatial Planning, Urbanism and Landscape, of the Valencian Community, Landscape Integration Studies (hereinafter EIP) must contain a Public Participation Plan (hereinafter PPP) to know the opinion or preferences of the interested public regarding the value of the landscapes concerned, the definition of landscape quality objectives and the options considered in the projects to be accompanied. The PPP is a document that defines and develops the public participation strategy and is included as an attached document to the Landscape Integration Study.

L14 REIS, S.L. is the developer of the 9.98 MW “TwinHouse” Photovoltaic Solar Plant, on rustic estates in the municipality of Villena (Alicante). Specifically, in the area known as Las Cabezuelas, according to the map of the National Geographic Institute at a scale of 1:25,000 in its Sheet 0845 “Yecla”.

This PUBLIC PARTICIPATION PLAN is presented as part of the Landscape Integration Study of these projects, in accordance with Law 5/2014, of July 25, on Spatial Planning, Urbanism and Landscape, of the Valencian Community.

To carry out the plan, we request that a brief survey be completed to assess the landscape elements considered in the Landscape Integration Study (Landscape Units and Landscape Resources), as well as the contribution of some landscape resource that they consider has not been included and that would be worth considering for the study.

With the image shown in each question, it is a matter of evaluating, according to your preference, the landscape quality of each Landscape Unit or landscape resource, evaluating each one from Very Low to Very High.

Remember that you are not valuing the photographic quality, but rather the scene shown.

Ideas we share

What we really think. 0% spam contamination

Evaluation
4/7/25

Tramitación proyectos almacenamiento de energía mediante baterías

El nuevo Real Decreto-ley introduce medidas urgentes para mejorar la resiliencia de la red, impulsar el almacenamiento, facilitar la electrificación y agilizar la integración de renovables, marcando un punto de inflexión en la modernización del sistema eléctrico español.
Evaluation
3/7/25

Estrategia para la conservación de las pardelas en España

Una hoja de ruta nacional para frenar el declive de las pardelas mediante acciones coordinadas, protección de hábitats clave y compatibilidad con actividades humanas
Biodiversity
1/7/25

Bioacústica de murciélagos en el BioCampus 2025

Bioacústica de murciélagos en el BioCampus 2025: divulgación, ciencia y formación ambiental en la Universidad de Cádiz.
Evaluation
Sustainability
27/6/25

Estudio de Impacto Ambiental para la repotenciación de parques eólicos: claves, ventajas y oportunidades

Aprende cómo abordar la repotenciación de parques eólicos con un estudio de impacto ambiental completo. Evaluamos cada fase del proyecto: diseño, tramitación ambiental y ejecución sostenible.

Join the tribe. Work at Ideas Medioambientales.

Una oportunidad emocionante en el campo de la consultoría medioambiental. Trabaja en proyectos apasionantes que tienen un impacto positivo en el medio ambiente y la sostenibilidad. Únete al equipo y sé parte del cambio.