Spain is getting late

The European's union goal for 2030 is that 32% of its energy must be from arenewable source, in other words, the reduction of 40% of greenhouse gases. Spain is getting late for the 2020 purpose, which was 20% of the energy must be renewable. In 2018 the statistics shows that it was a bit late, only 16%. So, to catch the European renewable energy train, nowadays we are seeing a massive number of projects executed and planned for the future here in Spain.

The environmental procedures

Every project has a previous phase, as the administrative procedures. So, what are the environmental procedures before the execution of a renewable energy project? The environmental evaluation of these kind of projects has three documents:

  • Technical project: It summarizes the design, localization and the way of execution.
  • Environmental impact study (from now on ESia): Identify, prevent impacts.
  • Environmental Impact Declaration (DIA): The environmental authority decision, about the conditions and the ways of execution, only from the environmental side.

Types of Environmental Evaluation (EIA)

There are two types of Environmental Evaluation (EIA) in Spain: Ordinary and simplified. How do we know which one needs our project? To answer the previous question, there are two laws that determine the environmental evaluation of renewable energy projects: Law 21/2013, of 9th of December of environmental evaluation. (Official State Gazette No. 296, 11/12/2013) A basic state rule, determine the procedures and the annexed parts of the projects that need to start an EIA.

Estudio Ambiental Parque Eólico Ideasmedioambientales.com
  • Annex I: Projects with an ordinary EIA Group 3: energy industry. Paragraph i: installations that use the wind power to produce energy and have 50 or more windmills, or, they produce more than 30 MW, or, are located within 2 km of another operational wind farm, under construction, or with a DIA. Paragraph j: Installations with the purpose of the production of electricity from solar energy and destined to be sold. Not situated on buildings roofs, with more than 100 ha of land occupation.
  • Annex II: Projects with a simplified EIAGroup 4: energy industry. Paragraph g: installations that use the wind power to produce energy, not included in Annex I. except the ones destined to self-supply and less than 100 KW of total power. Paragraph i: Installations with the purpose of the production of electricity from solar energy and destined to be sold. Not included in Annex I nor situated on buildings roofs nor urban lands. With more than 10 ha of land occupation.Law 4/2007, 8th of March of Environmental evaluation in Castilla-La Mancha. (DOCM No. 60, 20/03/2007).

Autonomous law, Castilla-La Mancha

Autonomous law, development rule and additional protection. Sets up the periods of procedures and additional project to the one mentioned in the state law.

  • Annex I: Projects with an ordinary EIA Group 3: energy industry. Paragraph f: Installations for the use of solar energy with a thermal power greater than 20 MW. Or more than 100 ha of occupied land.Paragraph j: installations that use the wind power to produce energy and have 25 or more windmills, or, are located within 2 km of another operational wind farm, or, they have more than 10 windmills when they are built in sensitive areas, Law 9/1999, of Natural conservation in Castilla-La Mancha.
  • Annex II: Projects with a simplified EIA Group 4: energy industry. Paragraph j: Installations with the purpose of the production of electricity from solar energy located in rustic lands with a thermal power greater than 1 MW or more than 5 ha of occupied land. Paragraph k: low powered wind farms and windmills connected to distribution lines or substations, or windfarms not included in Annex I.
Vigilancia Ambiental de la Central solar fotovoltaica

After the description of all types of projects, we can say that projects that belong to Annex I, in both laws, the EIA is mandatory, so, the technical document of the project, the start request of the EIA, fees and the ESia must be submitted to the substantive body. On the other hand, those projects included in Annex II, the start request of the EIA, fees and the environmental document (not ESia) must be submitted to the substantive body and with its environmental impact report (Not DIA) you decide if the project doesn't need an EIA, or, an ESia is needed.

If your company intends to invest in renewable energies in Spain or already doing it, Environmental ideas can help you as is already doing with other companies.

Ideas we share

What we really think. 0% spam contamination

Sustainability
5/5/25

Special Action Project: the urban key to Data Centers in the Community of Madrid

The Special Action Projects facilitate the implementation of data centers in Madrid. Discover how they overcome urban barriers.
Evaluation
Surveillance
Sustainability
30/4/25

Noise isn't good, but good doesn't make noise

On International Noise Awareness Day, we remember that reducing acoustic impact is key to protecting our health and biodiversity: you don't always have to make noise to get noticed, you just need to find the right sound.
Biodiversity
24/4/25

Invasive species and renewable energy

The expansion of invasive species threatens biodiversity. We analyze their impact, causes and how to prevent their progress in environmental projects.
Biodiversity
22/4/25

Mother Earth in the Eyes Kachiri

40 years ago, The Emerald Forest denounced the destruction of the Amazon. Today, the challenge of conserving biodiversity remains current and requires action.

Join the tribe. Work at Ideas Medioambientales.

Una oportunidad emocionante en el campo de la consultoría medioambiental. Trabaja en proyectos apasionantes que tienen un impacto positivo en el medio ambiente y la sostenibilidad. Únete al equipo y sé parte del cambio.